Skyline Engineering logoSKYLINEENGINEERING PVT LTD
Home / Our expertise
Our expertise

Specialist capabilities.
Connected delivery.

Construction packages for transmission lines from 132 kV to 500 kV, with methods suited to each site and scope.

Construction expertise

Foundation works

Civil construction for transmission tower foundations, including excavation, reinforcement and concrete works.

  • Pit excavation and preparation
  • Rebar cage assembly and stub setting
  • Concrete placement, curing and backfilling
Enquire about this service →
Foundation works
Construction expertise

Tower erection

Lattice tower assembly and erection using methods selected for access and terrain.

  • Tower assembly and erection
  • Crane-based erection on accessible sites
  • GIN pole methods for constrained locations
Enquire about this service →
Tower erection
Construction expertise

Conductor & OPGW stringing

Line installation activities for transmission corridors, including conductors and optical ground wire.

  • Twin-bundle and quad-bundle conductor stringing
  • Sagging and line hardware installation
  • OPGW installation and associated works
Enquire about this service →
Conductor & OPGW stringing
Construction expertise

Substation line integration

Transmission line termination works connecting overhead corridors to substation structures.

  • Overhead line connections to gantry structures
  • Insulator strings and tension hardware
  • Coordination with substation construction requirements
Enquire about this service →
Substation line integration
Construction expertise

Borehole drilling

Borehole drilling support for water supply and infrastructure projects.

  • Project-specific drilling requirements
  • Coordination with the wider water supply scope
Enquire about this service →
Borehole drilling
Foundation construction

From excavation to backfill.

Excavation

01 / Excavation

Prepare pits and address soil and groundwater conditions in line with site requirements.

Rebar & stub setting

02 / Rebar & stub setting

Assemble reinforcement and align tower stubs against survey and drawing requirements.

Concrete placement

03 / Concrete placement

Place, compact and cure concrete, with checks at the required construction stages.

Inspection & backfill

04 / Inspection & backfill

Inspect the completed foundation before backfilling and compacting the surrounding soil.

Let's build the next connection

Your next project.
Our expertise.

Tell us about your corridor, site requirements or construction package.